Columbia Basin College Science Lab Alterations

Columbia Basin College Science Lab Alterations

Status

Bidding Closed

Prebid Date 5/8/24 2:00pm
Bid Date 5/22/24 1:00pm

Company & Contacts

Integrus Architecture
Kayla Stoker  
509-838-8681

Location

Pasco, Wa

ADVERTISEMENT FOR BIDS

Sealed bids will be accepted for the following project:

PROJECT NO.: 2024-086 G (2-1)

TITLE: CBC - Science Lab Alterations

AGENCY: FPS for Columbia Basin College

PROJECT MANAGER: Dave Hickman

ESTIMATED BID COST RANGE: $1,700,000.00 to $2,100,000.00

SUBMITTAL

TIME/DATE/LOCATION:

No later than 1:00 PM, Wednesday, May 22, 2024.

Submit Online at DES Public Procurement Portal

Bonfire: https://deswa.bonfirehub.com

(See additional information below)

Bids should be submitted no later than 1:00 PM for the

Virtual Public Bid Opening on Microsoft Teams

which will be held at approximately 1:30 PM on

Wednesday, May 22, 2024

Join on your computer, mobile app or room device

Click here to join the meeting

Meeting ID: 232 943 171 100

Passcode: WPJKXj

Download Teams | Join on the web

Or call in (audio only)

+1 564-999-2000,,994059963# United States,

Olympia

(833) 322-1218,,994059963# United States (Tollfree)

Phone Conference ID: 994 059 963#

Find a local number | Reset PIN

(See additional information below)

SUBCONTRACTOR LISTINGS:

For bid proposals exceeding $1M, each bidder shall

submit:

Form A (HVAC, Plumbing, and Electrical) with its

bid proposal or within one hour after the bid submittal

time/date.

Form B (Structural Steel Install, Rebar Install)

within 48 hours after the bid submittal time/date.

Forms A and B must be emailed to:

FPSsubcontractorlist@des.wa.gov

ISSUED BY:

Department of Enterprise Services

Facility Professional Services

PRE-BID WALK-THROUGH:

2:00 P.M. on Wednesday, May 8, 2024 at Columbia Basin College, T Building, 2600 North 20th Avenue, Pasco, WA 99301.

For specific directions for an on-site pre-bid meeting or

site visit, please contact the Consultant listed below.

All Public Works Bid Openings will be conducted via live stream on Microsoft Teams. A link to the

live stream for bid opening can be found above. We will strive to begin bid opening live streams

within thirty minutes of the bid closing and appreciate your patience as we deploy this new process.

If you have questions, please contact the Project Manager, Dave Hickman at

david.hickman@des.wa.gov or (360) 339-2280.

This link provides support with the Bonfire Vendor Registration Process.

https://vendorsupport.gobonfire.com/hc/en-us/articles/15646869029783-Vendor-Registration

This link provides support with the Bonfire Bid Submission Process.

https://vendorsupport.gobonfire.com/hc/en-us/articles/6832869814551-Creating-and-Uploading-a-

Submission-

For Bonfire Vendor Support please visit the link on the website at

https://vendorsupport.gobonfire.com/ with additional support articles and videos to help vendors.

Vendors can email Support@GoBonfire.com if they encounter problems.

Contractors may obtain plans and specifications from the DES Public Procurement Portal Bonfire

https://deswa.bonfirehub.com or from the Plan Centers listed below. Contractors may also obtain

plans and specifications from Standard Printworks, 256 West Riverside Avenue, Spokane, WA 99201,

telephone (509) 624-2985, https://www.standardprintworks.com upon deposit of $250.00. Please

make checks payable to Integrus Architecture, PS. Plans must be returned in good condition within

seven (7) days following bid date to obtain a refund of deposit. After seven days no refunds will be made.

List of plan centers: Abadan Reprographics & Imaging, Spokane, WA; ARC Document Solutions,

Seattle, WA; ARC Document Solutions, Tacoma, WA; Associated Builders & Contractors,

Spokane, WA; Associated General Contractors, Boise, ID; Builder’s Exchange of Washington,

Everett, WA; Daily Journal of Commerce Plan Center, Portland, OR; Daily Journal of Commerce,

Seattle, WA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Milwaukie, OR;

Ridgeline Graphics (Wenatchee Plan Center), Wenatchee, WA; Spokane Regional Plan Center,

Spokane, WA; Tri-City Construction Council, Kennewick, WA; Walla Walla Valley Plan Center,

Walla Walla, WA; Weekly Construction Reporter, Bellingham, WA; Yakima Plan Center, Yakima,

WA.

Please direct questions regarding this project to the office of the Consultant, Integrus Architecture,

PS, 10 South Cedar Street, Spokane, WA 99201, (509) 838-8681, attn: Kayla Stoker,

kstoker@integrusarch.com.

Bid Results will be available on the DES Public Procurement Portal Bonfire:

https://deswa.bonfirehub.com following the bid opening.

The State of Washington prevailing wage rates are applicable for this public works project located

in Franklin County. Bidders are responsible to verify and use the most recent prevailing wage rates.

The “Effective Date” for this project is the bid submittal time and date above. The applicable

prevailing wage rates may be found on the Department of Labor & Industries website located at

https://secure.lni.wa.gov/wagelookup/.

Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction

contract. Voluntary workforce diversity goals for this apprentice participation are identified in the

Instructions to Bidders and the General Conditions for Washington State Facility Construction.

Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain

information on available apprenticeship programs.

In accordance with RCW 39.30.060, if the base bid and the sum of the alternates (if applicable)

combined together reach one million dollars or more, the Bidder is required to provide the names

of the Subcontractors with whom the Bidder will directly subcontract for the performance of

heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on

Subcontractor List Form A within one hour of the bid submittal time via email to

FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with

whom the Bidder will subcontract for structural steel installation and rebar installation on

Subcontractor List Form B within 48 hours of the bid submittal time via email to

FPSsubcontractorlist@des.wa.gov.

Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in “DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA”. Please direct questions regarding this subject to the office of the Consultant.

The successful Bidder is required to register and create an account in the DES Diversity Compliance

program (B2Gnow) at https://des.diversitycompliance.com. Voluntary numerical Diverse Business

goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been

established for this project. Achievement of the goals is encouraged.

Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at

http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize

Washington Small Businesses registered in WEBS at https://pr-webs-vendor.des.wa.gov/ and

Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-ownedbusinesses/vob-search.

The State reserves the right to accept or reject any or all bids and to waive informalities.

STATE OF WASHINGTON

DEPARTMENT OF ENTERPRISE SERVICES

FACILITY PROFESSIONAL SERVICES